[QuadList] NBC Control System
dcfwtx at aol.com
dcfwtx at aol.com
Mon Apr 6 09:47:19 CDT 2009
Yes, they were piled up in the edit bay hall way in Burbank. It
appeared to me that 90% never were installed.
David
-----Original Message-----
From: Gary Adams <garyada at ix.netcom.com>
To: 'Quad List' <quadlist at quadvideotapegroup.com>
Sent: Mon, 6 Apr 2009 6:57 am
Subject: Re: [QuadList] NBC Control System
Anybody remember the Grumman Sync Procs? I have two of them. A bit
overkill
but would sync anything into anything. I think I have the schematics
and
manuals as well.
Gary Adams
-----Original Message-----
From: quadlist-bounces at quadvideotapegroup.com
[mailto:quadlist-bounces at quadvideotapegroup.com] On Behalf Of Phillip G.
Shaw
Sent: Monday, April 06, 2009 3:15 AM
To: quadlist at quadvideotapegroup.com
Subject: Re: [QuadList] NBC Control System
[quote]You may have more detailed documentation, but I have several RCA
white papers describing many aspects of NBC systems from back in the
1970's.
Here are links to scans of the first 3 pages of one of the white
papers. This one is named "NBC Switching Central". Phillip, if you
don't
have this white paper and you'd like to, I've scanned all 10 pages of
it and
can either send them to you or link you to the remaining pages once
they are
uploaded to Flickr.
<http://www.flickr.com/photos/dennisdegan/3403168581/>
[/quote]
Dennis Degan,
I will do you one better (only kidding). Thanks for the White paper;
page 1
has the picture of a very young person that I know well. Dick
Edmondson.
Dick & I became good friends when I went into management and he became
my
most important source for knowledge. The original system evolved over
the
Years but Dick was also a NBC Software consultant for other projects up
into
the 90's. He was living in South Jersey, Medford Lakes. If he is
still on
the planet he would most likely love to talk about the NBC system.
I was never in Burbank... my sources John Fishettte (SP) VP of
Operations
& Steve Orland, aka "Flat line" when he messed with SC. They had the
same
channel Packages and Automation as NY. I think Bob Butler (NY Labs)
also
updated the Burbank Sky path at the same time as NY. That team was
under
Jack Weir..
The Panel is the Machine Control, the 10 sync sources was before my
time.
When you have News, Sports & entertainment plus WNBC & Network it
becomes
necessary for multiple timing rings. The ZSD (1 line delay)
installation
made the Control Room daisy chains (re-entry) simpler. The ZSD was a
modified NEC FS18 Frame sync. It was not until 1995 that we were able
to
replace those with a Leitch (2 line Delay)
Regards,
_______________________________________________
Please trim posts to relevant info when replying!
Send QuadList list posts to QuadList at quadvideotapegroup.com
Your subscribe, unsubscribe and digest options are here:
http://mail.quadvideotapegroup.com/mailman/listinfo/quadlist_quadvideotapegr
oup.com
_______________________________________________
Please trim posts to relevant info when replying!
Send QuadList list posts to QuadList at quadvideotapegroup.com
Your subscribe, unsubscribe and digest options are here:
http://mail.quadvideotapegroup.com/mailman/listinfo/quadlist_quadvideotapegroup.com
More information about the QuadList
mailing list