[QuadList] Tape Delay Systems

Chuck Reti cwreti at gmail.com
Sun Apr 15 12:51:29 CDT 2012


I remember in late 60's the senior engineers at Wayne State Univ TV having to devise a delay system for some reason. Available were two TRT-1's. The difficult part was that they were arranged in the VTR room at a 90 degree angle, with a walkway space between them. They came up with a most interesting tape path, using some homebrew guides at appropriate angles, which, after some trial and some damaged tape, eventually worked reasonably well. No photos, unfortunately.

Chuck Reti
Detroit MI
WV8A




More information about the QuadList mailing list